NGCP Power Plant Project

logo-iconNGCP Power Plant Project

Southeast Asia | Utility-Scale Generation | Delivering Custom Oil-Immersed Transformers Under Tight Deadlines in Tropical Conditions
Region: Southeast Asia
Project Type: Power Plant Auxiliary & Grid Interconnection
Key Challenges: Complex low-voltage high-current connections, extreme heat and humidity, and compressed delivery window (April–May)

Project Overview
TSTY Electric’s Customized Solution
Engineered for Southeast Asia, Validated Globally
Continue Reading
Project Overview
For a new power plant on Oriental Mindoro Island (Mimaropa Region), the National Grid Corporation of the Philippines (NGCP) required custom oil-immersed transformers to support auxiliary and step-down functions. The design featured unusually high low-voltage currents and complex busbar interconnections, demanding specialized terminal arrangements. Compounding the challenge, the tropical climate—characterized by sustained high temperatures and >80% relative humidity—required enhanced moisture protection. Critically, the project timeline allowed only seven weeks from final drawing approval in early April to full delivery by end of May.
overview_pic
Key project requirements included
overview_logo_1
Custom low-voltage buswork to handle high current and intricate wiring layouts
overview_logo_2
Enhanced protection against heat and humidity for long-term reliability
overview_logo_3
Accelerated manufacturing and logistics to meet a non-extendable grid commissioning date
overview_logo_4
Full compliance with Philippine utility standards and IEC norms
TSTY Electric’s Customized Solution
TSTY delivered two custom oil-immersed power transformers (10 MVA and 12.5 MVA) with extended copper busbars and reinforced LV connection terminals to accommodate high-current, multi-circuit configurations. All units were tropicalized with sealed gaskets, anti-condensation heaters, and corrosion-resistant finishes. To meet the aggressive schedule, TSTY activated an expedited production lane—compressing design, fabrication, and testing into under 6 weeks—while coordinating direct sea freight to Mindoro.
Core Technical Adaptations
Custom LV busbar and extended copper terminals for high-current complex wiring
Tropicalized design with anti-humidity sealing and corrosion-resistant components
Expedited production and logistics to deliver within 7-week critical window
Integrated switchgear package: SF6 breakers, disconnectors, CTs, and surge arresters
solution_pic_1
solution_pic_2
solution_pic_3
solution_pic_1
solution_pic_2
solution_pic_3
Equipment Scope Delivered
Equipment
Configuration
Quantity
Key Features

Oil-Immersed Power Transformer

10/12.5 MVA,
69/13.8 kV & 13.8/0.44 kV

2 units

• Full copper windings
• IEC 60076 compliant
• Tropicalized enclosure

Auxiliary Switchgear Package

SF6 circuit breakers, isolators,
CTs, surge arresters

Complete set

• Pre-coordinated with
    transformer ratings
• Humidity-sealed enclosures

*All units passed third-party type testing per regional requirements prior to shipment.
Engineered for Southeast Asia, Validated Globally
In island-grid projects where time, climate, and electrical complexity converge, success hinges on precision customization and execution speed.
pictext_pic_1
Precision Buswork for High-Current Demands
The custom LV terminal layout eliminated field modifications, ensuring safe, low-impedance connections for high-current auxiliary loads.
pictext_pic_2
Built for the Tropics, Tested for Reliability
Sealed cable entries, anti-condensation systems, and marine-grade coatings protect core components from persistent heat and humidity.
pictext_pic_3
From Approval to Delivery in 6 Weeks
By prioritizing the order through a dedicated fast-track production line, TSTY met NGCP’s immovable deadline without compromising quality.
pictext_pic_4
A Trusted Partner for Philippine Grid Modernization
With seamless integration of transformers and switchgear—and full alignment with local utility practices—TSTY supported one of Mimaropa’s most time-sensitive power infrastructure milestones, reinforcing its role in Southeast Asia’s energy transition.

Ready to Deploy Your Project?

If you’re developing a power, renewable, industrial, or infrastructure project in a challenging environment, TSTY Electric provides the engineering depth, production agility, and field support to make it succeed.

Ready to Deploy Your Project?